Published February 1987
| Version v1
Report
Open
Construction and performance of a permanent earth anchor (tieback) system for the Stanford Linear Collider
Description
The Stanford Linear Collider is the newest addition to the high-energy physics research complex at the Stanford Linear Accelerator Center. One of the many unique features of this project is the large, underground pit, where massive particle detectors will study the collision of subatomic particles. The large, open pit utilizes nearly 600 permanent earth anchors (tiebacks) for the support of the 56 ft (17 m) high walls, and is one of the largest applications of tiebacks for permanent support of a structure. This paper examines the use of tiebacks on this project with emphasis on their installation and performance
Availability note (English)
Available from NTIS, PC A02/MF A01; 1 as DE87006778.Files
19001930.pdf
Files
(375.3 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:a4c01de87f2b9a3a5b8cebe82d46798d
|
375.3 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 8 p.
- Report number
- SLAC-PUB--4211
Conference
- Title
- International symposium on prediction and performance in geotechnical engineering.
- Dates
- 17-19 Jun 1987.
- Place
- Calgary, Alberta (Canada).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 19001930
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; FASTENERS; FIELD TESTS; MONITORING; PERFORMANCE; SPECIFICATIONS; STANFORD LINEAR COLLIDER
- Descriptors DEC
- ACCELERATORS; LINEAR ACCELERATORS
Optional Information
- Notes
- Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted.
- Secondary number(s)
- CONF-870671--1.