Published 2001 | Version v1
Miscellaneous Open

Third party liability of nuclear installation decommissioning with Russian nuclear submarines as an example: insurance versus technologies

  • 1. PREKSAT Ltd., Moscow (Russian Federation)
  • 2. Reseaarch and Development Institute of Nuclear Power Engineering, Moscow (Russian Federation)
  • 3. All-Russian Research Institute on NPP Operation, Moscow (Russian Federation)
  • 4. Ministry for Nuclear Energy Of Russian, Moscow (Russian Federation)
  • 5. Research and Technological Center for Nuclear and Radiation Safety of Supervisory, Nuclear Energy State Commitee of Russia, Moscow (Russian Federation)
  • 6. Nuclear Safety Institute of Russian Academy of Sciences, Moscow (Russian Federation)

Description

Third party and environment of civil liability damage caused by incidents at military nuclear installations, for instance at decommissioned NPS (nuclear powered submarines), may be divided into three main trends: -) Liability of NPS without high-enriched irradiated nuclear fuel (SNF) for its self-submersion (radiation incident); -) Liability of NPS with SNF aboard for its self-submersion (radiation incident); and -) Liability of floating NPS for its SNF discharge (nuclear accident). Without step-by-step transition from the Russian Federation guaranties to insurance and making allowance for liability limits according to the Vienna Convention approach, the sizes of the financial guarantee for the civil liability of the NPS owner (Russian state), in US dollars of 2000, are approximately assessed as the following: -) storing decommissioned NPS or a floating module without SNF - from 12 to 25 thousand dollars per year (per one submarine or module); -) storing decommissioned NPS with SNF inside reactors cores - from 25 to 40 thousand dollars per year; -) assembly-by-assembly removing SNF from reactors' core of decommissioned NPS - up to 1.5 million dollars for undamaged reactor per the discharging period; -) SNF removing within reactor using the filled in-space reactor's core by liquid-phased hardened or dispersed solid-phase materials from decommissioned NPS - from 30 to 50 thousand dollars for undamaged reactor per the discharging period. Both rates and sums for NPS with damaged reactors are to be estimated for the each damaged reactor and NPS at all. It is necessary to perform the measures reducing the risk of nuclear accidents of NPS with undamaged SNF and NPS with damaged reactors in possibly short time. It will allow not only to cut risks by ten times and more, but also to accumulate necessary insurance reserves faster. These measures can be partially or completely executed using the preventing measures reserves assigned to all decommissioned Russian NPS and separate groups of NPS and reactor compartments afloat

Availability note (English)

Available from INIS in electronic form

Files

33003434.pdf

Files (205.7 kB)

Name Size Download all
md5:729aded84fc2ccc91bf009435bd6fccf
205.7 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
[10 p.]
Report number
INIS-FR--486

Conference

Title
9. international conference on nuclear engineering
Dates
8-12 Apr 2001
Place
Nice, Acropolis (France)

INIS

Country of Publication
France
Country of Input or Organization
France
INIS RN
33003434
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ACCIDENT INSURANCE; COST ESTIMATION; NUCLEAR LIABILITY; REACTOR DECOMMISSIONING; RISK ASSESSMENT; RUSSIAN FEDERATION; SUBMARINES
Descriptors DEC
DECOMMISSIONING; EASTERN EUROPE; EUROPE; INSURANCE; LIABILITIES; SHIPS

Optional Information

Notes
37 refs.