Published December 1, 2004
| Version v1
Report
Electroweak and top physics results from D0
Description
The collider Run II at Fermilab that started in March 2001 with upgraded accelerator complex and detectors is progressing extremely well. An integrated luminosity of 670 pb-1 was delivered to the CDF and D0 experiments each, by the end of August 2004. Additional planned upgrades to the accelerators will result in an integrated luminosity of 4-8 fb-1 for each experiment by the end of 2009. I present some preliminary electroweak and top quark physics measurements made by the D0 collaboration analyzing data sets corresponding to integrated luminosity in the range of 150-250 pb-1
Availability note (English)
Available from PURL: https://www.osti.gov/servlets/purl/15016979-XHKaQj/native/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 14 p.
- Report number
- FERMILAB-CONF--04-434-AD
Conference
- Title
- 10. International Symposium on Particles, Strings and Cosmology (PASCOS 04 and Pran Nath Fest)
- Dates
- 16-22 Aug 2004
- Place
- Boston, MA (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 36107103
- Subject category
- S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; BEAM LUMINOSITY; COSMOLOGY; FERMILAB; FERMILAB COLLIDER DETECTOR; T QUARKS
- Descriptors DEC
- ELEMENTARY PARTICLES; FERMIONS; MEASURING INSTRUMENTS; NATIONAL ORGANIZATIONS; POSTULATED PARTICLES; QUARKS; RADIATION DETECTORS; TOP PARTICLES; US DOE; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- AC--02-76CH03000
- Funding organization
- US Department of Energy (United States)