Published May 15, 1990 | Version v1
Report Restricted

Summary report for 1990 inservice inspection (ISI) of SRS 100-K reactor tank

Description

The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in about 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. The purpose of this inspection was to determine if selected welds in the K Reactor tank wall contained any indications of IGSCC. These portions included areas in and beyond the weld HAZ, extending out as far as two to three inches from the centerline of the welds, plus selected areas of base metal at the intersection of the main tank vertical and mid-girth welds. No evidence of such degradation was found in any of the areas examined. This inspection comprised approximately 60% of the accessible weld length in the K Reactor tank. Initial setup of the tank, which prior to inspection contained Mark 60B target assemblies but no Mark 22 fuel assemblies, began on January 14, 1990. The inspection was completed on March 9, 1990

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92009099; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
68 p.
Report number
WSRC-RP--90-396

Optional Information

Contract/Grant/Project number
Contract AC09-89SR18035
Funding organization
USDOE, Washington, DC (United States).