Technical Assistance Contractor management plan. Revision 1

Description

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96003970; NTIS; US Govt. Printing Office Dep.

Files

27041599.pdf

Files (2.7 MB)

Name Size Download all
md5:4fffea3721731fca4d9c80427da5f99b
2.7 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
90 p.
Report number
DOE/AL/62350--155-Rev.1

INIS

Optional Information

Contract/Grant/Project number
Contract AC04-91AL62350
Funding organization
USDOE, Washington, DC (United States).