Long-term optimization of outage performance
- 1. Framatome ANP GmbH (Germany)
- 2. Isar Nuclear Power Station (Germany)
Description
Deregulation of the power markets and the accompanying pressure on electricity prices have forced all electric utilities to reduce their power generating costs in order to be able to hold their own in the new market environment. This has also particularly affected the operators of nuclear power plants since they have to compete against the lower power generating costs of fossil-fired combined-cycle power plants and, in Germany are faced with a difficult political climate. The areas identified as having the greatest cost-cutting potential were fuel costs, operating costs and measures to increase plant availability. The main objective behind increasing plant availability was not only to improve the already high standard of operational reliability and plant safety even further, but also to significantly shorten the downtime needed for annual refueling outages. A variety of measures aimed at shortening scheduled plant outages have thus been developed and successfully implemented by nuclear plant operators. At the same time, process improvements and new technologies have been introduced by the service providers. Both initiatives together have contributed towards substantially reducing outage time and cost. (author)
Additional details
Publishing Information
- Publisher
- Atomic Energy Society of Japan
- Imprint Place
- Tokyo (Japan)
- Imprint Title
- GENES4/ANP2003: International conference on global environment and advanced nuclear power plants
- Imprint Pagination
- [1675 p.]
- Journal Page Range
- [8 p.]
Conference
- Title
- International conference on global environment and advanced nuclear power plants
- Acronym
- GENES4/ANP2003
- Dates
- 15-19 Sep 2003
- Place
- Kyoto (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 36081228
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST; IN-SERVICE INSPECTION; MODULAR STRUCTURES; NUCLEAR POWER PLANTS; REACTOR MAINTENANCE; REACTOR OPERATION
- Descriptors DEC
- INSPECTION; MAINTENANCE; NUCLEAR FACILITIES; OPERATION; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP, MACINTOSH; Acrobat Reader is included; Data in PDF format, Session 7. Operation and Management of LWR, Paper 1133