Published 1992 | Version v1
Book

Performance of the upgraded positron generator at KEK

  • 1. National Lab. for High Energy Physics, Tsukuba, Ibaraki (Japan)

Description

As a part of the TRISTAN project, the KEK positron generator was constructed on the south-west side of the Photon Factory 2.5-GeV electron linac; it was then combined with the 2.5-GeV linac. To meet increasing requirements regarding positron beam use, the focusing system of the KEK positron generator was extensively reconstructed. The upgrade strategy, construction and performance of this system are described. (R.P.) 5 refs.; 2 figs.; 3 tabs

Part of:
Proceedings of the 3. European particle accelerator conference V. 1

Additional details

Publishing Information

Publisher
Editions Frontieres.
Imprint Place
Paris (France)
ISBN
2-86332-114-5
Imprint Title
Proceedings of the 3. European particle accelerator conference. V. 1
Imprint Pagination
[908 p.].
Journal Page Range
p. 524-526.

Conference

Title
3. European particle accelerator conference.
Acronym
EPAC 92
Dates
24-28 Mar 1992.
Place
Berlin (Germany).

Optional Information