Published December 2014 | Version v1
Journal article

Heat balance calculation and feasibility analysis for initial startup of Fuqing nuclear turbine unit with non-nuclear steam

  • 1. Fujian Fuqing Nuclear Power Co., Ltd., Fuqing (China)

Description

Non-nuclear steam run up compared with nuclear steam run up, can verify the design, manufacture, installation quality of the unit, at the same time shorten the follow-up duration of the entire group ready to start debugging time. In this paper, starting from the first law of thermodynamics, Analyzed Heat balance Calculation and Feasibility analysis for Initial startup of Fuqing nuclear Turbine unit with Non-nuclear steam, By the above calculation, to the system requirements and device status on the basis of technical specifications, confirmed the feasibility of Non-nuclear steam running up in theory. After the implementation of the Non-nuclear turn of Fuqing unit, confirmed the results fit with the actual process. In summary, the Initial startup of Fuqing turbine unit with Non-nuclear steam is feasible. (authors)

Additional details

Publishing Information

Journal Title
China Nuclear Power
Journal Volume
7
Journal Issue
Suppl.2
Journal Page Range
p. 103-108
ISSN
1674-1617

Optional Information

Notes
2 figs., 7 tabs., 2 refs.