Probabilistic analysis of modernization options

Description

This paper reports on benefit-cost analysis for hydropower operations, a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting future benefits and costs is that they usually cannot be represented with sufficient reliability by accurate values, because of the many uncertainties that enter the analysis through assumptions on inputs and system parameters. Therefore, ranges of variables need to be analyzed instead of single values. As a consequence, the decision criteria, such as net benefit and benefit-cost ratio, also vary over some range. A probabilistic approach will be demonstrated as a tool for assessing the reliability of the results

Additional details

Publishing Information

Publisher
American Society of Civil Engineers.
Imprint Place
New York, NY (United States)
ISBN
0-87262-814-0
Imprint Title
Waterpower '91
Imprint Pagination
2275 p.
Journal Page Range
p. 19-28.

Conference

Title
international conference on hydropower.
Acronym
WATERPOWER '91
Dates
24-26 Jul 1991.
Place
Denver, CO (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
23060227
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COST BENEFIT ANALYSIS; COST OVERRUNS; FORECASTING; HYDROELECTRIC POWER; HYDROELECTRIC POWER PLANTS; PLANNING; PROBABILISTIC ESTIMATION; PROGRAM MANAGEMENT; RELIABILITY; US DOE
Descriptors DEC
COST; ECONOMIC ANALYSIS; ELECTRIC POWER; ENERGY SOURCES; MANAGEMENT; NATIONAL ORGANIZATIONS; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES; US ORGANIZATIONS

Optional Information

Secondary number(s)
CONF-910778--.