Probabilistic analysis of modernization options
Creators
Description
This paper reports on benefit-cost analysis for hydropower operations, a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting future benefits and costs is that they usually cannot be represented with sufficient reliability by accurate values, because of the many uncertainties that enter the analysis through assumptions on inputs and system parameters. Therefore, ranges of variables need to be analyzed instead of single values. As a consequence, the decision criteria, such as net benefit and benefit-cost ratio, also vary over some range. A probabilistic approach will be demonstrated as a tool for assessing the reliability of the results
Additional details
Publishing Information
- Publisher
- American Society of Civil Engineers.
- Imprint Place
- New York, NY (United States)
- ISBN
- 0-87262-814-0
- Imprint Title
- Waterpower '91
- Imprint Pagination
- 2275 p.
- Journal Page Range
- p. 19-28.
Conference
- Title
- international conference on hydropower.
- Acronym
- WATERPOWER '91
- Dates
- 24-26 Jul 1991.
- Place
- Denver, CO (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23060227
- Subject category
- S13: HYDRO ENERGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST BENEFIT ANALYSIS; COST OVERRUNS; FORECASTING; HYDROELECTRIC POWER; HYDROELECTRIC POWER PLANTS; PLANNING; PROBABILISTIC ESTIMATION; PROGRAM MANAGEMENT; RELIABILITY; US DOE
- Descriptors DEC
- COST; ECONOMIC ANALYSIS; ELECTRIC POWER; ENERGY SOURCES; MANAGEMENT; NATIONAL ORGANIZATIONS; POWER; POWER PLANTS; RENEWABLE ENERGY SOURCES; US ORGANIZATIONS
Optional Information
- Secondary number(s)
- CONF-910778--.