Closeout of NRC Bulletin 88-05: Nonconforming materials supplied by Piping Supplies, Inc., at Folsom, New Jersey, and West Jersey Manufacturing Company at Williamstown, New Jersey

Description

This report documents the activities that led to the closeout of U.S. Nuclear Regulatory Commission (NRC) Bulletin 88-05, which was issued on May 6, 1988. The bulletin required that licensees submit information on materials supplied by Piping Supplies, Inc. (PSI) and West Jersey Manufacturing Company (WJM), and requested that they (1) ensure that these materials complied with the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code) and design specifications or were suitable for their intended service or (2) replace such materials. Supplements 1 and 2 were issued on June 15 and August 3, 1988, respectively. In Supplement 2, another affiliated supplier, Chews Landing Metal Manufacturers, Incorporated (CLM), was identified. The staff concluded that (1) the analytical procedures used to qualify the nonconforming parts and the analysis results provide and adequate basis for resolving the staff's concerns regarding fitting and flanges; (2) even though the materials supplied by PSI, WJM, and CLM with falsified certified material test reports do not meet the ASME Code, their use is an acceptable alternative in accordance with Section 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations; (3) activities in response to Bulletin 88-05 regarding fittings and flanges can be closed for all operating plants; and (4) licensees should evaluate the use of product forms other fittings and flanges

Availability note (English)

MF available from INIS under the Report Number; NTIS, PC A05/MF A01 - GPO as TI90010748; OSTI; INIS.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
77 p.
Report number
NUREG--1402