Creation and Plan of an Underground Geologic Radioactive Waste Isolation Facility at the Nizhnekansky Rock Massif in Russia

Description

This joint geologic repository project in Russia was initiated in May 2002 between the United States (U.S.) International Science and Technology Center (ISTC) and the Federal State Unitary Enterprise ''All-Russian Research and Design Institute of Production Engineering'' (VNIPIPT). The project (ISTC Partner Project 2377) is funded by the U.S. Department of Energy Office of Civilian Radioactive Waste Management (DOE-RW) for a period of 2-1/2 years. ISTC project activities were integrated into other ongoing geologic repository site characterization activities near the Mining and Chemical Combine (MCC K-26) site. This allowed the more rapid development of a plan for an underground research laboratory, including underground design and layouts. It will not be possible to make a final choice between the extensively studied Verkhne-Itatski site or the Yeniseiski site for construction of the underground laboratory during the project time frame because additional data are needed. Several new sources of data will become available in the next few years to help select a final site. Studies will be conducted at the 1-km deep borehole at the Yeniseisky site where drilling started in 2004. And in 2007, after the scheduled shutdown of the last operating reactor at the MCC K-26 site, data will be collected from the rock massif as the gneiss rock cools, and the cool-down responses modeled. After the underground laboratory is constructed, the data collected and analyzed, this will provide the definitive evidence regarding the safety of the proposed geologic isolation facilities for radioactive wastes (RW). This data will be especially valuable because they will be collected at the same site where the wastes will be subsequently placed, rather than on hypothetical input data only. Including the operating costs for 10 to 15 years after construction, the cost estimate for the laboratory is $50M. With additional funding from non-ISTC sources, it will be possible to complete this important facility and to extend the use of the underground models developed there to other future sites such as for low-level waste, near-surface disposal of solid wastes

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/15011550-13v44a/native/

Additional details

Publishing Information

Imprint Pagination
0.5 Megabytes
Report number
UCRL-CONF--206438

Conference

Title
Waste Management Conference 2005
Dates
27 Feb - 3 Mar 2005
Place
Tucson, AZ (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
36040782
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BOREHOLES; CONSTRUCTION; DESIGN; DRILLING; MINING; OPERATING COST; PRODUCTION; RADIOACTIVE WASTE MANAGEMENT; RADIOACTIVE WASTES; SAFETY; SHUTDOWN; SITE CHARACTERIZATION; SOLID WASTES; UNDERGROUND FACILITIES; WASTE MANAGEMENT
Descriptors DEC
CAVITIES; COST; MANAGEMENT; MATERIALS; RADIOACTIVE MATERIALS; WASTE MANAGEMENT; WASTES

Optional Information

Contract/Grant/Project number
W-7405-ENG-48
Funding organization
US Department of Energy (United States)