Published 1977 | Version v1
Book

Remote servicing considerations for near-term power reactors (The Next Step)

  • 1. Oak Ridge National Lab., TN

Description

Next-generation tokamaks require special consideration for remote servicing. Three major problems are highlighted: (a) movement of heavy components, (b) remote connection/disconnection of joints, and (c) remote cutting, welding, and leak detection. The first problem is assumed to be handled with existing expertise; it is not considered. The remaining problems are thought to be minimized by considering two engineering departures from conventional tokamak design: (a) locating the field shaping coils outside the toroidal coils, and (b) enclosing the total device within an evacuated reactor cell. Five topics under this vacuum building concept are discussed: incremental cost, vacuum pumping, tritium containment, activation topology, and first-year operations

Additional details

Publishing Information

Publisher
American Nuclear Society, Inc.
Imprint Place
La Grange Park, IL
Imprint Title
Proceedings of the 25th conference on remote systems technology
Journal Page Range
p. 315-321.

Conference

Title
25. remote systems technology symposium.
Dates
27 Nov 1977.
Place
San Francisco, CA, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
9393496
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CONTAINMENT; COST; FABRICATION; MAINTENANCE; REMOTE CONTROL; REMOTE HANDLING; REMOTE HANDLING EQUIPMENT; THERMONUCLEAR REACTORS; TRITIUM; VACUUM SYSTEMS; WELDING
Descriptors DEC
BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; CONTROL; HYDROGEN ISOTOPES; ISOTOPES; JOINING; LIGHT NUCLEI; NUCLEI; ODD-EVEN NUCLEI; RADIOISOTOPES; YEARS LIVING RADIOISOTOPES

Optional Information

Notes
Imprint:See CONF-771117--.