Published 1994
| Version v1
Miscellaneous
Restricted
Present status of control system for the RCNP ring cyclotron
Creators
- 1. Osaka Univ., Ibaraki (Japan). Research Center for Nuclear Physics
Description
The computer control system of the RCNP Ring Cyclotron was used for operation since 1991. In the initial stage we had many troubles for the software as well as hardware. In 1992, we modified the system configuration and overcame the problems which observed during the actual operation. Summary of the control system is shown and typical troubles are summarized with our means of settling. (author)
Files
Additional details
Publishing Information
- Imprint Title
- Proceedings of the 9th symposium on accelerator science and technology
- Imprint Pagination
- 509 p.
- Journal Page Range
- p. 71-72.
- Report number
- INIS-JP--037
Conference
- Title
- 9. symposium on accelerator science and technology.
- Dates
- 25-27 Aug 1993.
- Place
- Tsukuba, Ibaraki (Japan).
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 27022495
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AUGMENTATION; COMPUTER NETWORKS; COMPUTERIZED CONTROL SYSTEMS; CONSOLES; DEC COMPUTERS; DISPLAY DEVICES; MAN-MACHINE SYSTEMS; MODIFICATIONS; RCNP CYCLOTRON; TASK SCHEDULING
- Descriptors DEC
- ACCELERATORS; COMPUTER OUTPUT DEVICES; COMPUTER-GRAPHICS DEVICES; COMPUTERS; CONTROL SYSTEMS; CYCLIC ACCELERATORS; CYCLOTRONS; DATA PROCESSING; HEAVY ION ACCELERATORS; ISOCHRONOUS CYCLOTRONS; ON-LINE CONTROL SYSTEMS; ON-LINE SYSTEMS