Published 2004 | Version v1
Miscellaneous

A study on the applications of leak-before-break to RCS loop for Kori Unit 1 NPP

  • 1. Korea Electric Power Research Institute, Taejon (Korea, Republic of)

Description

The development and application of the leak-Before-Break concept to Kori unit 1 nuclear power plant piping are reviewed. A general procedure and criteria of LBB are also introduced. In order to study feasibility of LBB, a limit load method and a J-T method are evaluated for comparison. Both methodologies are applied to the stainless steel and carbon steel of reactor coolant system. The stability of postulated through wall crack on the nuclear piping are verified with elastic-plastic fracture mechanics using finite element method. It is concluded that the limit load and J-T method are acceptable for nuclear piping materials

Part of:
Proceedings of the 19th KAIF/KNS annual conference

Additional details

Publishing Information

Publisher
KAIF
Imprint Place
Seoul (Korea, Republic of)
Imprint Title
Proceedings of the 19th KAIF/KNS annual conference
Imprint Pagination
725 p.
Journal Page Range
p. 147-156

Conference

Title
19. KAIF/KNS annual conference
Dates
25-27 Apr 2004
Place
Seoul (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
36036190
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BREAKDOWN; FINITE ELEMENT METHOD; FRACTURE MECHANICS; KORI-1 REACTOR; LEAKS; PIPES; REACTOR COOLING SYSTEMS
Descriptors DEC
CALCULATION METHODS; COOLING SYSTEMS; ENERGY SYSTEMS; ENRICHED URANIUM REACTORS; MATHEMATICAL SOLUTIONS; MECHANICS; NUMERICAL SOLUTION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; TUBES; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
7 refs, 9 figs, 3 tabs