GT-MHR COMMERCIALIZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003
Description
OAK A271 GT-MHR COMERCIALiZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003. In the process of fabricating the MHR-1 irradiation test capsule, Petten has advised that three thermocouples (out of 24) and the Self Powered Neutron detector were damaged during high temperature brazing with the upper capsule lid. Procurement of new TCs and SPN is in process but there will be a delay in the irradiation test of about nine weeks. Startup of the irradiation is now projected to be July or August 2004. In preparation for performing the nuclear design analysis activities required by the advanced fuel studies task, a complete 3-D nuclear design analysis is first being performed of the GT-MHR reference design. This will serve as the baseline for studies of the advanced fuel nuclear design performance
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00815746; PURL: https://www.osti.gov/servlets/purl/815746-pJaRvl/native/
Files
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 8 p.
- Report number
- GA-A--23811
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 34087373
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Descriptors DEI
- DAMAGE; FABRICATION; IRRADIATION; IRRADIATION CAPSULES; NEUTRON DETECTORS; NUCLEAR FUELS; PERFORMANCE; PROCUREMENT; THERMOCOUPLES
- Descriptors DEC
- BUSINESS; ENERGY SOURCES; FUELS; MATERIALS; MEASURING INSTRUMENTS; RADIATION DETECTORS; REACTOR MATERIALS
Optional Information
- Contract/Grant/Project number
- AC03-01SF22343
- Funding organization
- (United States)