Published August 1, 2003 | Version v1
Report Restricted

GT-MHR COMMERCIALIZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003

Description

OAK A271 GT-MHR COMERCIALiZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003. In the process of fabricating the MHR-1 irradiation test capsule, Petten has advised that three thermocouples (out of 24) and the Self Powered Neutron detector were damaged during high temperature brazing with the upper capsule lid. Procurement of new TCs and SPN is in process but there will be a delay in the irradiation test of about nine weeks. Startup of the irradiation is now projected to be July or August 2004. In preparation for performing the nuclear design analysis activities required by the advanced fuel studies task, a complete 3-D nuclear design analysis is first being performed of the GT-MHR reference design. This will serve as the baseline for studies of the advanced fuel nuclear design performance

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00815746; PURL: https://www.osti.gov/servlets/purl/815746-pJaRvl/native/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
GA-A--23811

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
34087373
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Descriptors DEI
DAMAGE; FABRICATION; IRRADIATION; IRRADIATION CAPSULES; NEUTRON DETECTORS; NUCLEAR FUELS; PERFORMANCE; PROCUREMENT; THERMOCOUPLES
Descriptors DEC
BUSINESS; ENERGY SOURCES; FUELS; MATERIALS; MEASURING INSTRUMENTS; RADIATION DETECTORS; REACTOR MATERIALS

Optional Information

Contract/Grant/Project number
AC03-01SF22343
Funding organization
(United States)