Published January 1, 2001 | Version v1
Report

Beam-distribution system for multi-axis imaging at the Advanced Hydrotest Facility

Description

The Advanced Hydrotest Facility is to provide a time sequence of multiple radiographic images using a proton beam produced by a 50-GeV synchrotron. We give an overview of the approaches devised to produce up to twelve simultaneous radiographic images of an object by a sequence of beam-transport lines. The required distribution system has undergone a parametric study that optimizes its configuration within operational constraints. These constraints and our approach to configuration optimization for both superconducting and normal-conducting transport lines are described. Additionally, we describe the optics stratagems that were devised to meet system requirements.

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
LA-UR--01-3321

Conference

Title
2001 Particle Accelerator Conference
Dates
18-22 Jun 2001
Place
Chicago, IL (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
41122349
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; BEAM TRANSPORT; CONFIGURATION; DISTRIBUTION; OPTICS; OPTIMIZATION; PROTON BEAMS; TRANSPORT
Descriptors DEC
BEAMS; NUCLEON BEAMS; PARTICLE BEAMS

Optional Information