Published January 1, 2001
| Version v1
Report
Beam-distribution system for multi-axis imaging at the Advanced Hydrotest Facility
Description
The Advanced Hydrotest Facility is to provide a time sequence of multiple radiographic images using a proton beam produced by a 50-GeV synchrotron. We give an overview of the approaches devised to produce up to twelve simultaneous radiographic images of an object by a sequence of beam-transport lines. The required distribution system has undergone a parametric study that optimizes its configuration within operational constraints. These constraints and our approach to configuration optimization for both superconducting and normal-conducting transport lines are described. Additionally, we describe the optics stratagems that were devised to meet system requirements.
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- LA-UR--01-3321
Conference
- Title
- 2001 Particle Accelerator Conference
- Dates
- 18-22 Jun 2001
- Place
- Chicago, IL (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 41122349
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; BEAM TRANSPORT; CONFIGURATION; DISTRIBUTION; OPTICS; OPTIMIZATION; PROTON BEAMS; TRANSPORT
- Descriptors DEC
- BEAMS; NUCLEON BEAMS; PARTICLE BEAMS
Optional Information
- Funding organization
- US Department of Energy (United States)