Establishment of efficient periodical inspection of the nuclear power plant
Description
As the standard days required for periodical inspection of the 1000 MW class BWR power plants was determined to be about 76 days, the days of the Hamaoka Nuclear Power Plant since 1994 was 81 dyas at best. In the nuclear power plant in USA, saving of inspection period is promoted for reduction of power generation cost, and a 20s days inspection period is reported though difference of their regulations. In Japan, the Electrical Business Law was amended in 1995 after continuation of 31 years, management efficiency due to introduction of competition principle and reinvestigation of the electricity rates system was required, and saving of the inspection period became required as a measure of promotion of application efficiency for reduction of power generation cost on base of its safety. Here is described on efforts on saving of the periodical inspection days at the Hamaoka Nuclear Power Plant for its establishment of efficiency promotion since 1993. (G.K.)
Additional details
Publishing Information
- Journal Title
- Denki Kyokai Zasshi
- Journal Issue
- no.907
- Journal Page Range
- p. 15-18
- ISSN
- 0387-0758
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 30033080
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- BWR TYPE REACTORS; COST; EFFICIENCY; INSPECTION; JAPAN; NUCLEAR POWER PLANTS; REACTOR SAFETY; WORKING CONDITIONS
- Descriptors DEC
- ASIA; DEVELOPED COUNTRIES; ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; REACTORS; SAFETY; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS