Published August 2014
| Version v1
Journal article
Application of layered gravel-filling hole structure for in-situ leaching of multilayer sandstone uranium deposit
- 1. Beijing Research Institute of Chemical Engineering and Metallurgy, CNNC, Beijing (China)
Description
For multilayer sandstone uranium deposit, two or more filter layers have to be constructed in order to implement different mining process for each layer in one drilling hole. According to the character of multilayer sandstone uranium deposit, on the basis of gravel-filling hole structure construction technology, layered gravel-filling hole technology is employed to construct two filter layers by man-made aquifuge in one time. The practice shows that the method of using layered gravel-filling hole structure to construct filter layers for each aquifer has the advantages of simple operation, short construction period, once-through well construction and low drilling hole cost. (authors)
Additional details
Publishing Information
- Journal Title
- Uranium Mining and Metallurgy
- Journal Volume
- 33
- Journal Issue
- 3
- Journal Page Range
- p. 121-125, 129
- ISSN
- 1000-8063
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 49042638
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S58: GEOSCIENCES;
- Descriptors DEI
- AQUIFERS; BOREHOLES; CONSTRUCTION; LAYERS; LEACHING; MINING; SANDSTONES; URANIUM; URANIUM DEPOSITS
- Descriptors DEC
- ACTINIDES; CAVITIES; DISSOLUTION; ELEMENTS; GEOLOGIC DEPOSITS; METALS; MINERAL RESOURCES; RESOURCES; ROCKS; SEDIMENTARY ROCKS; SEPARATION PROCESSES
Optional Information
- Notes
- 8 figs., 2 tabs., 7 refs.