Published October 16, 2014
| Version v1
Miscellaneous
Gap-filling starts. Progress of water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi NPS (Reference)
Description
no abstract available
Availability note (English)
Available from Fukushima Nuclear Accident Archive https://f-archive.jaea.go.jp/dspace/handle/faa/161680?locale=engAdditional details
Additional titles
- Augmented title (English)
- Gap-filling starts: progress of water cutoff operation on the connection between the seawater piping trench and building of unit 2 and 3 of Fukushima Daiichi NPS on 2014-10-16
Identifiers
Publishing Information
- Imprint Pagination
- 1 p.
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 52050697
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature, No Abstract
- Descriptors DEI
- ACCIDENT MANAGEMENT; BOREHOLES; CONCRETES; CONTAMINATION; DRAINAGE; DUCTS; FLOW BLOCKAGE; FUKUSHIMA ACCIDENT DATA; FUKUSHIMA DAIICHI NUCLEAR POWER STATION; LEAKS; MELTDOWN; PIPES; WATER
- Descriptors DEC
- ACCIDENTS; BEYOND-DESIGN-BASIS ACCIDENTS; BUILDING MATERIALS; CAVITIES; DATASETS; DOCUMENT TYPES; FUKUSHIMA ACCIDENT ARCHIVE; HYDROGEN COMPOUNDS; MANAGEMENT; MATERIALS; OXYGEN COMPOUNDS; REACTOR ACCIDENTS; REACTOR SITES; SEVERE ACCIDENTS; TUBES
Optional Information
- Notes
- Photo files are available from Fukushima Nuclear Accident Archive, Japan; Nuclear Accidents Knowledge Taxonomy (NKMS, IAEA): 2-2-19 Water protection