Windscale pile core surveys

  • 1. Magnox Electric plc, Dartford (United Kingdom)
  • 2. Atkins (W.S.) Engineering Sciences Ltd., Warrington (United Kingdom)

Description

The two Windscale Piles were closed down, defueled as far as possible and mothballed for thirty years following a fire in the core of Pile 1 in 1957 resulting from the spontaneous release of stored Wigner energy in the graphite moderator. Decommissioning of the reactors commenced in 1987 and has reached the stage where the condition of both cores needs to be determined. To this end, non-intrusive and intrusive surveys and sampling of the cores have been planned and partly implemented. The objectives for each Pile differ slightly. The location and quantity of fuel remaining in the damaged core of Pile 1 needed to be established, whereas the removal of all fuel from Pile 2 needed to be confirmed. In Pile 1, the possible existence of a void in the core is to be explored and in Pile 2, the level of Wigner energy remaining required to be quantified. Levels of radioactivity in both cores needed to be measured. The planning of the surveys is described including strategy, design, safety case preparation and the remote handling and viewing equipment required to carry out the inspection, sampling and monitoring work. The results from the completed non-intrusive survey of Pile 2 are summarised. They confirm that the core is empty and the graphite is in good condition. The survey of Pile 1 has just started. (UK)

Part of:
Remote techniques for hazardous environments. Proceedings

Additional details

Publishing Information

Publisher
British Nuclear Energy Society.
Imprint Place
London (United Kingdom)
ISBN
0-7277-2537-8
Imprint Title
Remote techniques for hazardous environments. Proceedings
Imprint Pagination
322 p.
Journal Page Range
p. 180-190.

Conference

Title
Remote techniques for hazardous environments conference.
Dates
29-30 Apr 1996.
Place
Leicestershire (United Kingdom).

Optional Information