Published January 2008 | Version v1
Journal article

Construction techniques for containment dome shuttering work of nuclear island of fast reactor

  • 1. The First Branch of No.24 Construction Corporation of CNNC, Langfang (China)

Description

The difficult dome shuttering work was completed with more or less traditional construction method based on the shuttering system formed with shaped-steel belfast truss of the positioning beam, wood camber beam as keel, 50 mm-thick wood block as face plate, and fastener or bowl-buckle scaffold tool as the support, in which certain social and economic benefits were made. All these are supported by technology. (authors)

Additional details

Publishing Information

Journal Title
China Nuclear Power
Journal Volume
1
Journal Issue
1
Journal Page Range
p. 54-59
ISSN
1674-1617

Optional Information

Notes
5 figs.