Published June 1994 | Version v1
Report Open

Aespoe Hard Rock Laboratory. Annual Report 1993

Description

The Aespoe Hard Rock Laboratory is being constructed in preparation for the deep geological repository of spent fuel in Sweden. This Annual Report 1993 for the Aespoe Hard Rock Laboratory contains an overview of the work conducted. Present work is focused on verification of pre-investigation methods and development of the detailed investigation methodology. Construction of the facility and investigation of the bedrock are carried out in parallel. As of December 1993, 2760 m of the tunnel had been excavated to a depth of 370 m below the surface. An important and integral part of the work is further refinement of conceptual and numerical models for groundwater flow and radionuclide migration. Detailed plans have been prepared for several experiments to be conducted after the end of the construction work. Eight organizations from seven countries are now participating in the work at the Aespoe Hard Rock Laboratory and are contributing in different ways to the results being achieved

Availability note (English)

MF available from INIS under the Report Number.

Files

26017438.pdf

Files (1.8 MB)

Name Size Download all
md5:27f5873d2c67694968fbfbc75005a52c
1.8 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
82 p.
ISSN
0284-3757
Report number
SKB-TR--94-11