Published 2021 | Version v1
Book

Study on the beam intensity upgrade of J-PARC main ring

  • 1. High Energy Accelerator Research Organization (KEK), Accelerator Laboratory, Tsukuba, Ibaraki (Japan)
  • 2. Tokyo University, Tokyo (Japan)

Description

The beam intensity upgrade of the main ring of the Japan Proton Accelerator Research Complex (J-PARC) have been studied with simulations. The main ring delivered 30 GeV proton beams with the beam power of 500 kW at maximum to the neutrino facility in the recent operation. The number of accelerated protons was 2.61×1014 protons per pulse (ppp). The upgrade plan aims at a beam power of 1.3 MW with reduced cycling time of 1.16 s compared to the present cycle time of 2.48 s. Upgrades of the magnet power supplies and RF system are in progress to achieve faster cycling. Furthermore, an intensity upgrade to 3.3×1014 ppp is necessary, while keeping the beam loss under control to reduce residual radiation. The high intensity operation has been simulated with the particle tracking program SCTR, taking space charge effects into account. The simulations were performed for the present beam intensity to reproduce the present status of the beam loss and for the target beam intensity to estimate the beam loss. We studied the interaction of the beam with structure resonances as main cause of the beam loss. Possible alternative operational tunes were explored to improve beam survival. (author)

Availability note (English)

Available from DOI: https://doi.org/10.7566/JPSCP.33.011029
Part of:
Proceedings of the 3rd J-PARC Symposium (J-PARC2019)

Additional details

Identifiers

Publishing Information

Publisher
Physical Society of Japan
Imprint Place
Tokyo (Japan)
ISBN
978-4-89027-146-7
Imprint Title
Proceedings of the 3rd J-PARC Symposium (J-PARC2019)
Imprint Pagination
[934 p.]
Journal Page Range
p. 011029.1-011029.6

Conference

Title
3. J-PARC symposium
Acronym
J-PARC2019
Dates
23-27 Sep 2019
Place
Tsukuba, Ibaraki (Japan)

Optional Information

Notes
5 refs., 8 figs.