Shutdown/low power operations inspection
Description
A main breakout session (5-1/2 hours total) identified, open-quotes prioritizedclose quotes and then discussed the following issues: (a) Planning for shutdown; (b) Monitoring of shutdown activities; (c) Requirements before startup. Three later separate sessions (each of 3 hours duration) discussed the frequency and scope of inspections during shutdowns and other relevant topics. The results of all sets of discussions, which involved people from 16 different countries, are summarized in this section of the report. In view of time constraints, the type of shutdown considered was limited to planned periodic shutdowns of plants to carry out maintenance, examination and inspections which might also involve modification to the plants
Additional details
Publishing Information
- Imprint Title
- Proceedings of the international workshop on conduct of inspections and inspector qualification and training
- Imprint Pagination
- 226 p.
- Journal Page Range
- p. 17-20.
- Report number
- NUREG/CP--0128
Conference
- Title
- International workshop on conduct of inspections and inspector qualification and training.
- Dates
- 31 Aug - 3 Sep 1992.
- Place
- Chattanooga, TN (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 25053135
- Subject category
- S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- EMERGENCY PLANS; INSPECTION; LICENSING; MEETINGS; MONITORING; NUCLEAR POWER PLANTS; PERSONNEL; REACTOR SAFETY; REACTOR SHUTDOWN; REGULATIONS; TRAINING
- Descriptors DEC
- EDUCATION; LAWS; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; SHUTDOWN; THERMAL POWER PLANTS