Published February 1993 | Version v1
Report

Shutdown/low power operations inspection

Description

A main breakout session (5-1/2 hours total) identified, open-quotes prioritizedclose quotes and then discussed the following issues: (a) Planning for shutdown; (b) Monitoring of shutdown activities; (c) Requirements before startup. Three later separate sessions (each of 3 hours duration) discussed the frequency and scope of inspections during shutdowns and other relevant topics. The results of all sets of discussions, which involved people from 16 different countries, are summarized in this section of the report. In view of time constraints, the type of shutdown considered was limited to planned periodic shutdowns of plants to carry out maintenance, examination and inspections which might also involve modification to the plants

Part of:
Proceedings of the international workshop on conduct of inspections and inspector qualification and training

Additional details

Publishing Information

Imprint Title
Proceedings of the international workshop on conduct of inspections and inspector qualification and training
Imprint Pagination
226 p.
Journal Page Range
p. 17-20.
Report number
NUREG/CP--0128

Conference

Title
International workshop on conduct of inspections and inspector qualification and training.
Dates
31 Aug - 3 Sep 1992.
Place
Chattanooga, TN (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
25053135
Subject category
S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EMERGENCY PLANS; INSPECTION; LICENSING; MEETINGS; MONITORING; NUCLEAR POWER PLANTS; PERSONNEL; REACTOR SAFETY; REACTOR SHUTDOWN; REGULATIONS; TRAINING
Descriptors DEC
EDUCATION; LAWS; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; SHUTDOWN; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
NEA/CNRA/R--92-3; CONF-9208212--.