Beam instrumentations of positron damping ring at SuperKEKB Phase-II operation

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

We performed SuperKEKB Phase-II commissioning from March through July, 2018. Commissioning of the positron dumping ring started prior to that of the main ring in February of the year. There are monitor systems such as beam position monitor (BPM), synchrotron radiation monitor (SRM), beam loss monitor (LM), beam current monitor (DCCT) and bunch feedback system (FB) in the dumping ring as well as a main ring. These systems worked smoothly each. In this report, we introduce the outline and the operation situation of the dumping ring monitor system. (author)

Part of:
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
SuperKEKB Phase-IIでのダンピングリングビームモニターシステムの運転

Publishing Information

Imprint Title
Proceedings of the 15th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1380 p.]
Journal Page Range
p. 554-557

Conference

Title
15. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2018
Dates
7-10 Aug 2018
Place
Nagaoka, Niigata (Japan)

Optional Information

Notes
10 refs., 10 figs., 2 tabs. Imprint:#7B2C#15#56DE##65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#