Published May 1997 | Version v1
Report Restricted

RF systems for the NLCTA

Description

This paper describes an X-Band and RF system for the Next Linear Collider Test Accelerator. The RF system consists of a 90 MeV injector and a 540 MeV linac. The main components of the injector are two low-Q single-cavity prebunchers and two 0.9-m-long detuned accelerator sections. The linac system consists of six 1.8-m-long detuned and damped detuned accelerator sections powered in pairs. The rf power generation, compression, delivery, distribution and measurement systems consist of klystrons, SLED-II energy compression systems, rectangular waveguides, magic-T's, and directional couplers. The phase and amplitude for each prebuncher is adjusted via a magic-T type phase shifter/attenuator. Correct phasing between the two 0.9 m accelerator sections is obtained by properly aligning the sections and adjusting two squeeze type phase shifters. Bunch phase and bunch length can be monitored with special microwave cavities and measurement systems. The design, fabrication, microwave measurement, calibration, and operation of the sub-systems and their components are briefly presented

Availability note (English)

Available from INIS in electronic form and/or on microfiche ; Also available from OSTI as DE97007967; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
SLAC-PUB--7488

Conference

Title
17. IEEE particle accelerator conference.
Dates
12-16 May 1997.
Place
Vancouver (Canada).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
29013107
Subject category
S43: PARTICLE ACCELERATORS; S42: ENGINEERING;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM BUNCHING; DESIGN; KLYSTRONS; LINEAR COLLIDERS; RF SYSTEMS; WAVEGUIDES
Descriptors DEC
ACCELERATORS; BEAM DYNAMICS; DYNAMICS; ELECTRON TUBES; ELECTRONIC EQUIPMENT; EQUIPMENT; LINEAR ACCELERATORS; MECHANICS; MICROWAVE EQUIPMENT; MICROWAVE TUBES

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Funding organization
USDOE Office of Energy Research, Washington, DC (United States).
Secondary number(s)
CONF-970503--194.