Start-up procedure
Creators
- 1. Siemens A.G., Erlangen (F.R. Germany)
- 2. Kraftwerk Union A.G., Erlangen (F.R. Germany)
Description
The start-up procedure will be shown on a pressurized water reactor, although most of the activities will occur similarly in other reactor types. The commissioning time can be divided into 5 sections, the phases A to E together lasting 26 months. Subsequently there are a test run of one month and the handling-over of the plant to the operator. A survey of the commissioning sections with several important main events is shown. (orig./TK)
Availability note (English)
MF available from INIS under the Report Number.Abstract (German)
Das Anfahren wird an einem PWR beschrieben, obwohl die meisten Aktivitaeten in anderen Reaktortypen aehnlich vor sich gehen. Die Inbestriebsetzung kann in 5 Abschnitte unterteilt werden: die Phasen A bis E, die sich alles in allem ueber 26 Monate erstrecken. Danach folgt 1 Monat Testbetrieb und die Uebergabe der Anlage an den Betreiber. Es wird eine Uebersicht ueber die Inbetriebsetzungsabschnitte einschliesslich vieler wichtiger Vorgaenge gegeben. (orig./TK)
Files
Additional details
Publishing Information
- Imprint Pagination
- 21 p.
- Report number
- AED-Conf--75-769-083
Conference
- Title
- IAEA interregional training course on nuclear power project planning and implementation.
- Dates
- 8 Sep 1975.
- Place
- Karlsruhe, F.R. Germany.
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 7271191
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONTROL SYSTEMS; PERFORMANCE TESTING; PWR TYPE REACTORS; REACTOR COMMISSIONING; REACTOR COOLING SYSTEMS; REACTOR FUELING; TIME DEPENDENCE
- Descriptors DEC
- COOLING SYSTEMS; REACTOR COMPONENTS; REACTORS; TESTING; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 7 figs.