Impacts of Czech nuclear power plant life extension on the Dukovany LILW disposal facility capacity and the deep geological repository project
Description
The Dukovany site hosts, apart from the nuclear power plant, a disposal facility for operational low and intermediate-level wastes from the Dukovany as well as the Temelin NPPs, with a capacity corresponding to a minimum of 30 years of operation plus the waste created as a result of their decommissioning. Analysis shows that the capacity is sufficient for 40 and 60 years of the operation of the two NPPs, including the waste arising from future decommissioning. However, the Energy Concept of the Czech Republic assumes future commissioning of new NPPs, in which case the capacity of the Dukovany disposal facility will be exhausted by 2050 and the Czech Republic will have to look for an alternative solution to the disposal issue. (orig.)
Additional details
Additional titles
- Original title (Czech)
- Dopady prodlužování provozu jaderných elektráren v ČR na kapacitu ÚRAO Dukovany a projekt hlubinného úložiště
Publishing Information
- Journal Title
- Bezpecnost Jaderne Energie
- Journal Volume
- 24
- Journal Issue
- 7-8
- Journal Page Range
- p. 197-198
- ISSN
- 1210-7085
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Czech Republic
- INIS RN
- 47101061
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- DUKOVANY-1 REACTOR; LIFETIME EXTENSION; RADIOACTIVE WASTE STORAGE; SPENT FUEL STORAGE; TEMELIN-1 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; LIFETIME; MANAGEMENT; POWER REACTORS; PWR TYPE REACTORS; RADIOACTIVE WASTE MANAGEMENT; REACTORS; SERVICE LIFE; STORAGE; THERMAL REACTORS; WASTE MANAGEMENT; WASTE STORAGE; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS
Optional Information
- Notes
- 1 tab., 2 photos, 2 refs.