Published March 1976 | Version v1
Report Open

Working group 4b: Regional aspects. Siting in Walloon region and offshore

  • 1. Louvain Univ. (Belgium)
  • 2. Conseil Economique Regional de Wallonie

Description

Four nuclear power plant solutions in view of siting have been considered. a) Saturation of the existing sites. The only site considered is Tihange where a 870 MWe power plant is operated and a 930 MWe is under construction. b) Creation of new sites only for the production of electrical power and/or thermal energy. There are two possibilities: the creation of a new site for big power stations on the Meuse river and the spreading of power plants of two kinds: supply of electricity only and double purpose production: vapor/electricity or heat/electricity. c) Creation of complete sites for the transformation of nuclear material: enrichment of fissile material; fuel elements fabrication, burning, spent fuel reprocessing and waste management. d) Off-shore power plant siting and the creation of an artificial island. (A.F.)

Files

9383045.pdf

Files (1.9 MB)

Name Size Download all
md5:fc6bd6a269cf131ae3a8445324d3bc3b
1.9 MB Preview Download

Additional details

Additional titles

Original title (French)
Groupe de travail 4b: Aspects regionaux. Sites en Wallonie, en eaux maritimes

Publishing Information

Imprint Title
Compilation of reports [prepared by various working groups on the evaluation of problems of utilizing nuclear energy in Belgium]
Journal Page Range
vp.
Report number
INIS-mf--4198

INIS

Country of Publication
Belgium
Country of Input or Organization
Belgium
INIS RN
9383045
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Descriptors DEI
BELGIUM; COOLING SYSTEMS; ENVIRONMENT; HYDROLOGY; LEGAL ASPECTS; METEOROLOGY; OFFSHORE SITES; REGIONAL ANALYSIS; SAFETY; SEISMOLOGY; SITE SELECTION; SOILS
Descriptors DEC
EUROPE

Optional Information

Notes
Imprint:Rapports de synthese.