Working group 4b: Regional aspects. Siting in Walloon region and offshore
Creators
- 1. Louvain Univ. (Belgium)
- 2. Conseil Economique Regional de Wallonie
Description
Four nuclear power plant solutions in view of siting have been considered. a) Saturation of the existing sites. The only site considered is Tihange where a 870 MWe power plant is operated and a 930 MWe is under construction. b) Creation of new sites only for the production of electrical power and/or thermal energy. There are two possibilities: the creation of a new site for big power stations on the Meuse river and the spreading of power plants of two kinds: supply of electricity only and double purpose production: vapor/electricity or heat/electricity. c) Creation of complete sites for the transformation of nuclear material: enrichment of fissile material; fuel elements fabrication, burning, spent fuel reprocessing and waste management. d) Off-shore power plant siting and the creation of an artificial island. (A.F.)
Files
9383045.pdf
Files
(1.9 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:fc6bd6a269cf131ae3a8445324d3bc3b
|
1.9 MB | Preview Download |
Additional details
Additional titles
- Original title (French)
- Groupe de travail 4b: Aspects regionaux. Sites en Wallonie, en eaux maritimes
Publishing Information
- Imprint Title
- Compilation of reports [prepared by various working groups on the evaluation of problems of utilizing nuclear energy in Belgium]
- Journal Page Range
- vp.
- Report number
- INIS-mf--4198
INIS
- Country of Publication
- Belgium
- Country of Input or Organization
- Belgium
- INIS RN
- 9383045
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY;
- Descriptors DEI
- BELGIUM; COOLING SYSTEMS; ENVIRONMENT; HYDROLOGY; LEGAL ASPECTS; METEOROLOGY; OFFSHORE SITES; REGIONAL ANALYSIS; SAFETY; SEISMOLOGY; SITE SELECTION; SOILS
- Descriptors DEC
- EUROPE
Optional Information
- Notes
- Imprint:Rapports de synthese.