Published September 6, 1994
| Version v1
Report
Open
Module strap tests and how they effect the 25 cm stack construction
Description
We were asked at the previous Atlas collaboration meeting to confirm our proposal that the Argonne design option could maintain the tie straps in a prestressed condition after welding. This was deemed necessary to maintain compression loading of the steel plate stack. The compression load requirement was set at a load equivalent to that necessary to maintain continuity of the stack using friction. We will attempt to prove that through the strap testing and the ultimate construction of the 25 cm prototype stack that we have in fact met these requirements
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95008295; NTIS; US Govt. Printing Office Dep.Files
26054734.pdf
Files
(501.7 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:a62172c9ac4d0e9845820bc3d59a1de9
|
501.7 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 12 p.
- Report number
- ANL--HEP-TR-95-04
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26054734
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- ATLAS SUPERCONDUCTING LINAC; MECHANICAL STRUCTURES; TESTING
- Descriptors DEC
- ACCELERATORS; HEAVY ION ACCELERATORS; HILACS; LINEAR ACCELERATORS
Optional Information
- Contract/Grant/Project number
- Contract W-31109-ENG-38
- Funding organization
- USDOE, Washington, DC (United States).