Published September 6, 1994 | Version v1
Report Open

Module strap tests and how they effect the 25 cm stack construction

Description

We were asked at the previous Atlas collaboration meeting to confirm our proposal that the Argonne design option could maintain the tie straps in a prestressed condition after welding. This was deemed necessary to maintain compression loading of the steel plate stack. The compression load requirement was set at a load equivalent to that necessary to maintain continuity of the stack using friction. We will attempt to prove that through the strap testing and the ultimate construction of the 25 cm prototype stack that we have in fact met these requirements

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95008295; NTIS; US Govt. Printing Office Dep.

Files

26054734.pdf

Files (501.7 kB)

Name Size Download all
md5:a62172c9ac4d0e9845820bc3d59a1de9
501.7 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
12 p.
Report number
ANL--HEP-TR-95-04

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26054734
Subject category
S43: PARTICLE ACCELERATORS;
Descriptors DEI
ATLAS SUPERCONDUCTING LINAC; MECHANICAL STRUCTURES; TESTING
Descriptors DEC
ACCELERATORS; HEAVY ION ACCELERATORS; HILACS; LINEAR ACCELERATORS

Optional Information

Contract/Grant/Project number
Contract W-31109-ENG-38
Funding organization
USDOE, Washington, DC (United States).