Published 2005 | Version v1
Miscellaneous

PEFP Vacuum Control System

  • 1. Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

Description

Development of a front end system for a high energy proton accelerator is in progress at Korea Atomic Energy Research Institute (KAERI) for basic science and industrial applications. The proper vacuum components has been installed and operated successfully between ion source and RFQ, DTL. The reliable operation of the accelerator has been completed at vacuum system in the high and ultra high vacuum range under operating conditions. Proper control system for the vacuum instruments, based on PC operated by Windows, has been designed and constructed by control group at PAL. As PC operated by windows with inherent instability does not proper, Windows OS had been replaced by Linux redhat9.0, and developed VME system for Dual Pump and NEG pump control

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Taejon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2005 autumn meeting of the KNS
Dates
27-28 Oct 2005
Place
Busan (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
37072337
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; CONTROL SYSTEMS; MONITORING; PUMPS; VACUUM SYSTEMS
Descriptors DEC
EQUIPMENT

Optional Information

Notes
3 refs, 3 figs, 2 tabs