Published September 1984 | Version v1
Report

Results gained from the operation of a uranium extraction cycle

  • 1. Kernforschungszentrum Karlsruhe G.m.b.H. (Germany, F.R.). Projektbereich Wiederaufarbeitungsanlage Karlsruhe

Description

The uranium extraction cycle consists of five pulsed columns, a mixer-settler for T separation, two raffinate washers, a prototype mixer-settler for U cleaning cycles and a mixer-settler for solvent cleaning. The design data for the extracting apparatuses of the projected WA-350 of the first cycle were derived from the results gained in the uranium extraction cycle. The operation of the uranium extraction cycle in interconnected operation is demonstrated. (DG)

Abstract (German)

Der Uranextraktionszyklus (UEZ) besteht aus fuenf Pulskolonnen, einem Mischabsetzer zur T-Abtrennung, zwei Raffinatwaeschern, einem prototypischen Mischabsetzer fuer die U-Reinigungszyklen und einem Mischabsetzer zur Loesungsmittelwaesche. Die Auslegungsdaten fuer die Extraktionsapparate der geplanten WA350 des 1. Zyklus wurden aus den UEZ-Ergebnissen abgeleitet und der Verbundbetrieb des UEZ demonstriert. (DG)

Additional details

Additional titles

Original title (German)
Ergebnisse aus dem UEZ-Betrieb

Publishing Information

Imprint Title
Collection of lectures given on the occasion of the 5th status report of the project of reprocessing and waste treatment
Imprint Pagination
495 p.
Journal Page Range
p. 274-287.
Report number
KFK--3740

Conference

Title
5. status report of the Project of Reprocessing and Waste Treatment of the Kernforschungszentrum Karlsruhe G.m.b.H.
Dates
20-21 Mar 1984.
Place
Karlsruhe (Germany, F.R.).

INIS

Country of Publication
Germany
Country of Input or Organization
Germany
INIS RN
17042993
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
MOCKUP; OPERATION; OPTIMIZATION; PLANNING; PUREX PROCESS; SOLVENT EXTRACTION
Descriptors DEC
REPROCESSING; SEPARATION PROCESSES; STRUCTURAL MODELS

Optional Information

Notes
Imprint:Sammlung der Vortraege anlaesslich des 5. Statusberichtes des Projektes Wiederaufarbeitung und Abfallbehandlung.
Secondary number(s)
PWA--47/84.