Published December 3, 1999 | Version v1
Report Restricted

Surface and subsurface soils at the Pond B dam: July 1998

Description

Pond B, 685-13G, is an inactive reactor cooling impoundment built in 1961 on the Savannah River Site (SRS). Between 1961 and 1964, Pond B received R-Reactor cooling water discharges that were contaminated with 137Cs, 90Sr and plutonium. Though the pond has not been used since 1964, radionuclides from the contaminated cooling water remain in the water and in the surface sediments of the pond. The current proposal to fix and repair the Pond B dam structure includes installing a new drain system and monitoring equipment. The dam will be reinforced with additional previous material on the downstream face of the dam. The objectives of this report are to describe the sampling methodology used during the July 1998 sampling event at the downstream face of the Pond B dam and in Pond B, present the results of the sampling event, and compare, where possible, these results to related risk-based standards

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00750105; PURL: https://www.osti.gov/servlets/purl/750105-m0abqm/webviewable/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
89 p.
Report number
WSRC-TR--98-00276/Rev.1

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Funding organization
US Department of Energy (United States)