Published June 18, 2001
| Version v1
Report
Open
RF SYSTEM FOR THE SNS ACCUMULATOR RING
Description
During accumulation the RF beam current in the spallation neutron source ring rises from 0 to 50 amperes. A clean, 250 nanosecond gap is needed for the extraction kicker risetime. Large momentum spread and small peak current are needed to prevent instabilities and stopband related losses. A robust RF system meeting these requirements has been designed
Availability note (English)
Available from INIS in electronic form; Also available from OSTI as DE00782062; PURL: https://www.osti.gov/servlets/purl/782062-ugJCiY/native/Files
32065122.pdf
Files
(354.5 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:b7278a1b64e88c531fb7ef4ec6223cb1
|
354.5 kB | Preview Download |
Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- BNL--67992
Conference
- Title
- Particle Accelerator Conference (PAC 2001)
- Dates
- 18-22 Jun 2001
- Place
- CHICAGO, IL (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 32065122
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM CURRENTS; BEAM EXTRACTION; DESIGN; KICKER MAGNETS; NEUTRON SOURCES; RF SYSTEMS; SPALLATION
- Descriptors DEC
- CURRENTS; EQUIPMENT; MAGNETS; NUCLEAR REACTIONS; PARTICLE SOURCES; RADIATION SOURCES
- Proposed descriptors and Free-text terms
- SPALLATION NEUTRON SOURCE
Optional Information
- Contract/Grant/Project number
- AC02-98CH10886
- Funding organization
- USDOE Office of Energy Research (ER) (United States)
- Secondary number(s)
- KC--0204019