Dismantling of an alpha contaminated hot cell at the Marcoule Pilot Plant

Description

For the remodeling of Marcoule Pilot Plant, the cell 82: old unit for plutonium solution purification by extraction, was dismantled. About 42 tons of wastes were evacuated. Some wastes wen decontaminated by mechanical means other wastes with higher residual activity were stored for subsequent processing. The operation shows that dismantling of a hot cell is possible even if incorporated in an operating plant

Availability note (English)

MF available from INIS under the Report Number.

Abstract (French)

Dans le cadre de la renovation des installations de l'Atelier Pilote de Marcoule (APM), la cellule 82, ancienne unite de purification par extraction des solutions de plutonium, a ete demantelee. Environ 42 tonnes de dechets technologiques ont ete evacues. Certains dechets particuliers ont pu etre decontamines par voie mecanique et ainsi etre declasses; d'autres, dont l'activite residuelle etait superieure aux normes, ont du etre entreposes dans l'attente d'un traitement ulterieur. Cette operation, a permis de demontrer qu'il etait possible de demanteler une cellule active desaffectee incorporee dans une installation en cours d'exploitation

Files

21040780.pdf

Files (300.6 kB)

Name Size Download all
md5:49f927f361987c814057ff2069754b84
300.6 kB Preview Download

Additional details

Additional titles

Original title (French)
Demantelement d'une cellule contaminee par les emetteurs alpha de l'atelier pilote de Marcoule

Publishing Information

Imprint Pagination
15 p.
Report number
CEA-CONF--9889

Conference

Title
15. Meeting of the Association pour les Techniques et les Sciences de Radioprotection.
Dates
5-7 Oct 1988.
Place
Grenoble (France).