Risk-based decision on configuration of AAC DGs in multi-units site
Description
Since a domestic nuclear plant site different from overseas has 6 units in a site, it is necessary to consider deeply a mitigating measure to station blackout accident (SBO). Currently it is proposed the installation of additional diesel generator to ensure an alternative AC power source, but it has not been decided yet how many diesel generators should be installed in a multi-units site: one or two. In this paper, risk-based decision making method, which evaluates reliability, core damage frequency, and average of core damage frequencies of nuclear power plants, is introduced to draw up the suitable number of diesel generator. The results shows that installing two diesel generators increases 1.4% of average of core damage frequencies as compared with installing one diesel generator but for both cases 4.5% of reliability of the electrical system equally increases. In the light of risk - informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one additional diesel generator sufficiently guarantees safety against station black out of nuclear power plants in multi-units site
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Taejon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS spring meeting
- Imprint Pagination
- [CDROM]
- Journal Page Range
- [9 p.]
Conference
- Title
- 2000 spring meeting of the KNS
- Dates
- 26-27 May 2000
- Place
- Kori (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 34027623
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- CONFIGURATION; DECISION MAKING; HAZARDS; NUCLEAR POWER PLANTS; OUTAGES; RELIABILITY; SAFETY
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- 3 refs, 2 figs, 2 tabs