Published May 28, 2003 | Version v1
Report

Beam physics at Tevatron complex

Description

The challenge of achieving the Tevatron Run II luminosity goal of 3 · 1032 cm-2 s-1 requires high level of engineering and machine operation, good and reliable diagnostics, and clear understanding of the underlying accelerator physics. Recent history demonstrated steady increase of the Tevatron luminosity, which was supported by each of the three listed above items. This report reviews major developments in the accelerator physics, which contributed in the Run II luminosity growth. Present limitations of the luminosity and projections of further luminosity growth are also discussed

Availability note (English)

Available FR-om PURL: https://www.osti.gov/servlets/purl/811237-fldsQA/native/

Additional details

Publishing Information

Imprint Pagination
113 Kilobytes
Report number
FERMILAB-Conf--03/093-E

Conference

Title
PAC 2003
Dates
12-16 May 2003
Place
Portland, OR (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
34043459
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM EMITTANCE; EFFICIENCY; FERMILAB TEVATRON; LUMINOSITY; RELIABILITY
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; OPTICAL PROPERTIES; PHYSICAL PROPERTIES; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
AC--02-76CH03000
Funding organization
USDOE Office of Energy Research (ER) (United States)