Published March 30, 1973
| Version v1
Report
Restricted
Dresden Nuclear Power Station, Unit 3. Main steam line area temperature switches out of calibration March 24, 1973
Description
no abstract available
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 2 p.
- Report number
- DOCKET-50249--203
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 4077312
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CALIBRATION; DRESDEN-3 REACTOR; LEGAL ASPECTS; MEDIUM TEMPERATURE; PIPELINES; REACTOR LICENSING; REACTOR OPERATION; STEAM; SWITCHES
- Descriptors DEC
- BWR TYPE REACTORS; ELECTRICAL EQUIPMENT; ENRICHED URANIUM REACTORS; LICENSING; OPERATION; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS