Published 1974
| Version v1
Report
Restricted
Edwin I. Hatch Nuclear Plant, Unit 1. Semiannual operating report, September 12--December 31, 1974
Creators
Description
Hatch-1 achieved initial criticality on September 12, 1974, and initial synchronization on November 11, 1974. The unit is a BWR of 813 MW(e) and has generated 50,775.6 MWH since September 12 with the generator on line 865.62 hours. Net plant efficiency was 20.88 percent with plant availability of 28.32 percent. Information is presented concerning operations, changes, tests, safety related maintenance, primary coolant chemistry, occupational personnel radiation doses, and radioactive effluent releases. (U.S.)
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 68 p.
- Report number
- DOCKET-50321--244
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 6210832
- Subject category
- S99: GENERAL AND MISCELLANEOUS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AVAILABILITY; CRITICALITY; EFFICIENCY; ELECTRIC POWER; FISSION PRODUCT RELEASE; HATCH-1 REACTOR; PERSONNEL; POWER GENERATION; PRIMARY COOLANT CIRCUITS; RADIATION DOSES; RADIOACTIVE WASTE DISPOSAL; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SHUTDOWN; TESTING; WATER CHEMISTRY
- Descriptors DEC
- BWR TYPE REACTORS; CHEMISTRY; ENRICHED URANIUM REACTORS; MAINTENANCE; MANAGEMENT; OPERATION; POWER; POWER REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; WASTE DISPOSAL; WASTE MANAGEMENT; WATER COOLED REACTORS; WATER MODERATED REACTORS