Erosion by cavitation on safety-related piping systems of French PWR units
Creators
- 1. Electricite de France, 75 - Paris (France). Service de la Production Thermique
Description
The first time traces of erosion inside of the pipe of the residual heat removal system was noticed during routine maintenance at Fessenheim-1 in 1982. After this, the similar damages were discovered in pipes of some other units. In studies and further inspections were launched to analyse the risk on the other units and systems. The present conclusions are that many systems of many units may be concerned, depending on the shape of the pipelines and operating conditions. So, the specific maintenance program was set up to recommend particular operating procedures and to study possible modifications for long term solutions. This paper discusses various problems of corrosion-erosion in pipelines: The possible incidents, the results of the inspections and analysis and their effects on maintenance and operation instructions, and the tentative long term solutions
Additional details
Publishing Information
- Imprint Title
- Corrosion and erosion aspects in pressure boundary components of light water reactors
- Imprint Pagination
- 93 p.
- Journal Page Range
- p. 31-40.
- Report number
- IWGRRPC--88-1
Conference
- Title
- Specialists' meeting on corrosion and erosion aspects in pressure boundary components of light water reactors.
- Dates
- 12-14 Sep 1988.
- Place
- Vienna (Austria).
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 22038336
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CORROSION; EROSION; FLOW RATE; INSPECTION; MAINTENANCE; MODIFICATIONS; PIPES; PWR TYPE REACTORS; REACTOR COOLING SYSTEMS; WATER CHEMISTRY
- Descriptors DEC
- CHEMICAL REACTIONS; COOLING SYSTEMS; ENRICHED URANIUM REACTORS; POWER REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WATER TREATMENT
Optional Information
- Contract/Grant/Project number
- Contract 259