Published April 1990 | Version v1
Report

Erosion by cavitation on safety-related piping systems of French PWR units

Creators

  • 1. Electricite de France, 75 - Paris (France). Service de la Production Thermique

Description

The first time traces of erosion inside of the pipe of the residual heat removal system was noticed during routine maintenance at Fessenheim-1 in 1982. After this, the similar damages were discovered in pipes of some other units. In studies and further inspections were launched to analyse the risk on the other units and systems. The present conclusions are that many systems of many units may be concerned, depending on the shape of the pipelines and operating conditions. So, the specific maintenance program was set up to recommend particular operating procedures and to study possible modifications for long term solutions. This paper discusses various problems of corrosion-erosion in pipelines: The possible incidents, the results of the inspections and analysis and their effects on maintenance and operation instructions, and the tentative long term solutions

Part of:
Corrosion and erosion aspects in pressure boundary components of light water reactors

Additional details

Publishing Information

Imprint Title
Corrosion and erosion aspects in pressure boundary components of light water reactors
Imprint Pagination
93 p.
Journal Page Range
p. 31-40.
Report number
IWGRRPC--88-1

Conference

Title
Specialists' meeting on corrosion and erosion aspects in pressure boundary components of light water reactors.
Dates
12-14 Sep 1988.
Place
Vienna (Austria).

INIS

Country of Publication
International Atomic Energy Agency (IAEA)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
22038336
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CORROSION; EROSION; FLOW RATE; INSPECTION; MAINTENANCE; MODIFICATIONS; PIPES; PWR TYPE REACTORS; REACTOR COOLING SYSTEMS; WATER CHEMISTRY
Descriptors DEC
CHEMICAL REACTIONS; COOLING SYSTEMS; ENRICHED URANIUM REACTORS; POWER REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WATER TREATMENT

Optional Information

Contract/Grant/Project number
Contract 259