INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS

Description

This is the 6th Quarterly Report under this contract. During this period, the Advanced ElectroCore module precharger and its support frame were installed at Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. This represents the vast portion of the installation work. Ductwork and instrumentation needs to installed before the Advanced ElectroCore module can be tested and demonstrated. Also, the Advanced ElectroCore test plan draft has been prepared, and a design arrangement of a new multipollutant control system with the ElectroCore has been developed

Availability note (English)

Available from OSTI as DE00794131

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
FC--26-00NT40757-06

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33055058
Subject category
S01: COAL, LIGNITE, AND PEAT; S20: FOSSIL-FUELED POWER PLANTS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
AIR POLLUTION CONTROL; ALABAMA; DESIGN; FLY ASH; FOSSIL-FUEL POWER PLANTS; INSTALLATION; PARTICLE SIZE; POLLUTION CONTROL EQUIPMENT
Descriptors DEC
AEROSOL WASTES; ASHES; COMBUSTION PRODUCTS; CONTROL; DEVELOPED COUNTRIES; EQUIPMENT; NORTH AMERICA; POLLUTION CONTROL; POWER PLANTS; RESIDUES; SIZE; THERMAL POWER PLANTS; USA; WASTES

Optional Information

Contract/Grant/Project number
FC26-00NT40757
Funding organization
US Department of Energy (United States)