INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
Description
This is the 6th Quarterly Report under this contract. During this period, the Advanced ElectroCore module precharger and its support frame were installed at Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. This represents the vast portion of the installation work. Ductwork and instrumentation needs to installed before the Advanced ElectroCore module can be tested and demonstrated. Also, the Advanced ElectroCore test plan draft has been prepared, and a design arrangement of a new multipollutant control system with the ElectroCore has been developed
Availability note (English)
Available from OSTI as DE00794131Additional details
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- FC--26-00NT40757-06
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 33055058
- Subject category
- S01: COAL, LIGNITE, AND PEAT; S20: FOSSIL-FUELED POWER PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- AIR POLLUTION CONTROL; ALABAMA; DESIGN; FLY ASH; FOSSIL-FUEL POWER PLANTS; INSTALLATION; PARTICLE SIZE; POLLUTION CONTROL EQUIPMENT
- Descriptors DEC
- AEROSOL WASTES; ASHES; COMBUSTION PRODUCTS; CONTROL; DEVELOPED COUNTRIES; EQUIPMENT; NORTH AMERICA; POLLUTION CONTROL; POWER PLANTS; RESIDUES; SIZE; THERMAL POWER PLANTS; USA; WASTES
Optional Information
- Contract/Grant/Project number
- FC26-00NT40757
- Funding organization
- US Department of Energy (United States)