Bayesian inference for thermal response test parameter estimation and uncertainty assessment
- 1. Institute of Industrial Science, The University of Tokyo, 4-6-1 Komaba, Meguro-ku, Tokyo 153-8505 (Japan)
- 2. Energy Efficient Cities Initiative, Department of Engineering, University of Cambridge, Trumpington Street, Cambridge CB2 1PZ (United Kingdom)
Description
Highlights: • Bayesian inference for TRT parameters and uncertainty assessment was proposed. • Not only point estimates of parameters but also credible intervals can be extracted. • Numerical TRT and sandbox TRT data were used to verify the proposed method. • Our method was used to examine the relationship between uncertainty and TRT time. • Estimation uncertainty decreased exponentially with increasing time: - Abstract: The effective ground thermal conductivity and borehole thermal resistance constitute information needed to design a ground-source heat pump (GSHP). In situ thermal response tests (TRTs) are considered reliable to obtain these parameters, but interpreting TRT data by a deterministic approach may result in significant uncertainties in the estimates. In light of the impact of the two parameters on GSHP applications, the quantification of uncertainties is necessary. For this purpose, in this study, we develop a stochastic method based on Bayesian inference to estimate the two parameters and associated uncertainties. Numerically generated noisy TRT data and reference sandbox TRT data were used to verify the proposed method. The posterior probability density functions obtained were used to extract the point estimates of the parameters and their credible intervals. Following its verification, the proposed method was applied to in situ TRT data, and the relationship between test time and estimation accuracy was examined. The minimum TRT time of 36 h recommended by ASHRAE produced an uncertainty of ~±21% for effective thermal conductivity. However, the uncertainty of estimation decreased exponentially with increasing TRT time, and was ±8.3% after a TRT time of 54 h, lower than the generally acceptable range of uncertainty of ±10%. Based on the obtained results, a minimum TRT time of 50 h is suggested and that of 72 h is expected to produce sufficiently accurate estimates for most cases.
Availability note (English)
Available from http://dx.doi.org/10.1016/j.apenergy.2017.10.034Additional details
Identifiers
- DOI
- 10.1016/j.apenergy.2017.10.034;
- PII
- S0306261917314459;
Publishing Information
- Journal Title
- Applied Energy
- Journal Volume
- 209
- Journal Page Range
- p. 306-321
- ISSN
- 0306-2619
- CODEN
- APENDX
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 50007788
- Subject category
- S71: CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSICS;
- Descriptors DEI
- GROUND SOURCE HEAT PUMPS; PROBABILITY DENSITY FUNCTIONS; STOCHASTIC PROCESSES; THERMAL CONDUCTIVITY
- Descriptors DEC
- FUNCTIONS; HEAT PUMPS; PHYSICAL PROPERTIES; THERMODYNAMIC PROPERTIES
Optional Information
- Copyright
- Copyright (c) 2017 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.