Outline of the fracture clauses of BS 7910:2013
Creators
- 1. TWI Ltd, Great Abington, Cambridge, CB21 6AL (United Kingdom)
- 2. EDF Energy Nuclear Generation Ltd, Gloucester, GL4 3RS (United Kingdom)
Description
Highlights: • How the fracture clauses of BS 7910:2013 have changed since the 2005 revision. • Origin of K-solutions, reference stress solutions and limit load solutions. • Validation of fracture clauses through large-scale testing. • Treatment of plastic collapse in cylinders containing axial flaws under internal pressure. This paper summarises the main features of the fracture clauses of BS 7910:2013, with particular emphasis on how and why the standard has changed relative to the earlier 2005 revision. The background to the current annexes addressing K-solutions (Annex M), limit load/reference stress solutions (Annex P) is also presented, along with details of how the fracture procedure has been validated, and some pointers to changes for the next revision.
Availability note (English)
Available from http://dx.doi.org/10.1016/j.ijpvp.2018.11.004Additional details
Identifiers
- DOI
- 10.1016/j.ijpvp.2018.11.004;
- PII
- S0308016118302345;
Publishing Information
- Journal Title
- International Journal of Pressure Vessels and Piping
- Journal Volume
- 168
- Journal Page Range
- p. 289-300
- ISSN
- 0308-0161
- CODEN
- PRVPAS
INIS
Optional Information
- Copyright
- Copyright (c) 2018 Elsevier Ltd. All rights reserved.