Published 1974 | Version v1
Report Restricted

AVR nuclear test power plant. 1. Quarterly report 1974 (1.1. - 31.3.1974)

Description

Automatic translation: The most important operating data of the AVR nuclear test power plant in 1st quarter 1974 Table I and Figures 1 - 3 are attached remove. On January 10, 1974, the power plant was used for external demonstration purposes off and on again. The generator was down after a downtime synchronized with the network again after approx. 2 h. On January 21, 1974, the power station for intensive training was new Shift staff left for 10 days. Parallel to the 2-week Training programs were - as far as the training program allowed - Maintenance and repair work as well as repeat tests carried out (see Chapter VII). In addition, the test section in the VAMPYR loop and the dust filter replaced.

Abstract (German)

Die wichtigsten Betriebsdaten des AVR-Atomversuchskraftwerks im 1. Quartal 1974 sind Tabelle I sowie den Abbildungen 1 - 3 zu entnehmen. Am 10. 1. 1974 wurde das Kraftwerk zu externen Demonstrationszwecken ab- und wieder angefahren. Der Generator wurde nach einer Ausfallzeit von ca. 2 h wieder mit dem Netz synchronisiert. Am 21. 1. 1974 wurde das Kraftwerk zur intensiven Ausbildung neuen Schichtpersonals für 10 Tage abgefahren. Parallel zum 2-wöchigen Ausbildungsprogramm wurden - soweit es das Ausbildungsprogramm zuließ - Wartungs- und Reparaturarbeiten sowie Wiederholungsprüfungen durchgeführt (vergl. Kapitel VII). Außerdem wurden die Meßstrecke im VAMPYR-Loop und das Staubfilter ausgewechselt.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
AVR Atomversuchskraftwerk. 1. Quartalsbericht 1974 (1.1. - 31.3.1974)

Publishing Information

Imprint Pagination
46 p.
Report number
INIS-DE--21M1356

Optional Information

Notes
Document from Juelich Preservation Project; 9 figs., 7 tabs.