Published November 2013 | Version v1
Journal article

Current status of ultrasonic examination performance demonstration in Korea

  • 1. Central Research Institute (CRI), Korea Hydro and Nuclear Power Co., Ltd. (KHNP), Daejeon (Korea, Republic of)

Description

The results of ultrasonic testing performed during in-service inspection period for main components of nuclear power plant are affected by the performance of each inspector. To enhance the reliability of inspection, the more restrictive qualification is required. The ASME B and PV code section XI adopted the performance demonstration requirements (Appendix VIII) for the ultrasonic examination of nuclear power plants in the 1989 winter addenda for the first time to enhance the inspection reliability. Korea Hydro and Nuclear Power Co. LTD (KHNP) has developed Korean Performance Demonstration (KPD) system for the ultrasonic examination to apply for pressurized light-water and pressurized heavy-water reactor power plants weld in accordance with ASME code section XI. This paper describes the current status of the ultrasonic examination performance demonstration for nuclear power plant in-service inspection in Korea. (author)

Additional details

Publishing Information

Journal Title
E-Journal of Advanced Maintenance
Journal Volume
4
Journal Issue
4
Journal Page Range
p. 133-141
ISSN
1883-9894

Optional Information

Notes
7 refs., 5 figs., 6 tabs.