Published July 1994
| Version v1
Report
Restricted
How to determine an IST program component scope
Creators
Description
A clear scope statement is vital for successful inservice testing (IST) or inspection (ISI) programs. This paper discusses the need to agree on the mission and objectives for a program before defining the scope of components to be tested or inspected. The paper then points out useful source documents (codes, regulatory guides, NUREGs, and standards) for specifying the components by safety class
Files
Additional details
Publishing Information
- Imprint Title
- Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 1
- Imprint Pagination
- 532 p.
- Journal Page Range
- p. 195-212.
- Report number
- NUREG/CP--0137-Vol.1
Conference
- Title
- 3. ASME/NRC symposium on valve and pump testing.
- Dates
- 18-21 Jul 1994.
- Place
- Washington, DC (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26033554
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- IN-SERVICE INSPECTION; NUCLEAR POWER PLANTS; REACTOR COMPONENTS; RISK ASSESSMENT; TESTING
- Descriptors DEC
- INSPECTION; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-940774--Vol.1.