Published September 24, 2001 | Version v1
Report

MAGNET PERFORMANCE AND RHIC COMMISSIONING

Description

The RHIC accelerator complex completed commissioning activities in 2000 and is presently operating for the first physics run. The complete ensemble of magnets was thus operating over an extended period for the first time. We review the magnet performance as well as relate machine performance characteristics and accelerator physics results to the various magnetic measurements made during the construction phase. The conclusions may be useful for the LHC Project

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/15006330-M7xzH5/native/

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
BNL--71431-2003-CP

Conference

Title
17. International Conference on Magnet Technology
Dates
24-28 Sep 2001
Place
Geneva (Switzerland)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
35019606
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; COMMISSIONING; CONSTRUCTION; MAGNETS; PERFORMANCE; PHYSICS
Descriptors DEC
EQUIPMENT

Optional Information

Contract/Grant/Project number
KB0202011; AC02-98CH10886
Funding organization
DOE/SC (United States)