Published September 24, 2001
| Version v1
Report
MAGNET PERFORMANCE AND RHIC COMMISSIONING
Description
The RHIC accelerator complex completed commissioning activities in 2000 and is presently operating for the first physics run. The complete ensemble of magnets was thus operating over an extended period for the first time. We review the magnet performance as well as relate machine performance characteristics and accelerator physics results to the various magnetic measurements made during the construction phase. The conclusions may be useful for the LHC Project
Availability note (English)
Available from PURL: https://www.osti.gov/servlets/purl/15006330-M7xzH5/native/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 6 p.
- Report number
- BNL--71431-2003-CP
Conference
- Title
- 17. International Conference on Magnet Technology
- Dates
- 24-28 Sep 2001
- Place
- Geneva (Switzerland)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 35019606
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; COMMISSIONING; CONSTRUCTION; MAGNETS; PERFORMANCE; PHYSICS
- Descriptors DEC
- EQUIPMENT
Optional Information
- Contract/Grant/Project number
- KB0202011; AC02-98CH10886
- Funding organization
- DOE/SC (United States)