Published January 1996 | Version v1
Report

Construction and alignment experience of Indus-1 SRS in C.A.T

  • 1. Centre for Advanced Technology, Indore (India)

Description

A 450 MeV Synchrotron Radiation Source, Indus-1 is being constructed at Centre for Advanced Technology at Indore in central India. This paper narrates our experience in construction and alignment of synchrotron machines which was first of its kind for most of us. Careful design, planning and execution of the work yielded modest results so that alignment accuracies between 0.1 to 0.3 mm could be achieved (in booster synchrotron) and, which have proved to be adequate up till now. The building of the SRS complex was constructed such that machine rings have their foundations isolated from rest of the building. A number of 100 x 150 mm size steel plates were embedded in the concrete of floor and walls to serve as base for reference surveying marks which were established later. The pre-injector and booster ring are enclosed in a radiation shielding zone with separate ventilation system. Dipoles, quadrupoles and a few sextupoles were fiducialised during their field mappings; on a CNC Hall-probe manipulator for dipoles and on rotating coil measuring machine for others. Fiducials were of two types- sticker type as well as accurately reamed holes to receive a precision target for alignment measurements with optical instruments. Due to small size of entire machine zone, we decided and used precision surveying method of using ECDS-2 coordinate determination system of KERN (now, Leica) and micrometer type N3 level of WILD. Additionally, accurate spirit levels (10/20 micron per m.) for preliminary leveling and an interferometer to calibrate CNC Hall-probe manipulator were also used. We faced some problems due to instrument failures which were circumvented by mixed use of KERN and WILD theodolites and hand feeding angular readings in the ECDS-2. Of late, the booster synchrotron experiments have established acceleration up to 480 MeV albeit, with very weak current, about 2 mA and first synchrotron light emission was directly observed on 26th Sept. 1995. (J.P.N.)

Part of:
Proceedings of the fourth international workshop on accelerator alignment (IWAA95)

Additional details

Publishing Information

Imprint Title
Proceedings of the fourth international workshop on accelerator alignment (IWAA95)
Imprint Pagination
521 p.
Journal Page Range
p. 39-51.
Report number
KEK-PROC--95-12

Conference

Title
4. international workshop on accelerator alignment.
Acronym
IWAA95
Dates
14-17 Nov 1995.
Place
Tsukuba, Ibaraki (Japan).

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
28008511
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALIGNMENT; BEAM BENDING MAGNETS; BEAM FOCUSING MAGNETS; BEAM TRANSPORT; CONSTRUCTION; FOUNDATIONS; MEV RANGE 100-1000; MICROTRONS; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ENERGY RANGE; EQUIPMENT; MAGNETS; MECHANICAL STRUCTURES; MEV RANGE; RADIATION SOURCES; SUPPORTS

Optional Information