Published 1994
| Version v1
Miscellaneous
600 GeV accelerating storage complex
Creators
Description
It is decided to transport the 400 GeV storage ring (UNK-1) earlier designed as a booster for the 3 TeV superconducting UNK, in an independent 600 GeV UNK (U-600) with a possibility to extract the accelerating beam into an experimental area. In the paper are described the U-600 tunnel construction, equipment testing and simulation. The U-600 construction time schedule is given. The beginning of physical investigations is planned in 1998
Additional details
Additional titles
- Original title (English)
- Materialy rabochego soveshchaniya UNK-600.
Publishing Information
- Imprint Title
- Workshop UNK-600 (proceedings)
- Imprint Pagination
- 238 p.
- Journal Page Range
- p. 3-8.
- Report number
- INIS-RU--414
Conference
- Title
- Workshop UNK-600.
- Original Conference Title
- Materialy rabochego soveshchaniya UNK-600
- Dates
- 23-24 Nov 1993.
- Place
- Protvino (Russian Federation).
INIS
- Country of Publication
- Russian Federation
- Country of Input or Organization
- Russian Federation
- INIS RN
- 27014854
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM INJECTION; CONSTRUCTION; FEASIBILITY STUDIES; GEV RANGE 100-1000; PROTON BEAMS; SCHEDULES; SPECIFICATIONS; STORAGE RINGS
- Descriptors DEC
- BEAMS; ENERGY RANGE; GEV RANGE; NUCLEON BEAMS; PARTICLE BEAMS
Optional Information
- Notes
- Imprint:Materialy rabochego soveshchaniya UNK-600.