Published May 1996 | Version v1
Report Open

UCH 3 and 4 plant computer system I/O point summary

Description

This technical report summarizes the UCN 3 and 4 I/O database points and is expected to be an important for many disciplines. There are several kind of plant tests before the commercial operation such as Preoperational Test, Cold Hydro Test (CHT), Hot Functional Test (HFT), and Power Ascension Test (PAT). Those are performed in a manner that the validity of the sensor inputs got to the Plant Computer System (PCS) and operational integrity of plant are determined by monitoring the addressable I/O point identification (PID) on the Plant Computer System operator console. For better performance of activities like Emergency Operating Procedure (EOP) computerization, Safety Parameter Display System (SPDS) development, and organizing integrated database for NSSS, referencing the past plant information about I/O database is highly expected. What's more, it is inevitable material for plant system research and general design document work to be done in future. So we present this report based on UCN database for better understanding of plant computer system. 5 refs. (Author) .new

Availability note (English)

MF available from INIS under the Report Number.

Files

27063058.pdf

Files (12.2 MB)

Name Size Download all
md5:77122c2be6f5f0d912e791a6c053ea45
12.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
232 p.
Report number
KAERI/TR--701/96